Customization: | Available |
---|---|
Shape: | Flat |
Appearance: | Flat Tempered |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Name | Tempered Glass / Toughened Glass / Safety Glass----EASTGLASS INDUSTRIAL | ||
Type | CLEAR TEMPERED GLASS WITH MOTIF CLEAR TEMPERED LAMINATED GLASS TINT TEMPERED GLASS WITH MOTIF TINT TEMPERED LAMINATD GLASS PATTERN TEMPERED GLASS WITH MOTIF LOW IRON TEMPERED LAMINATED GLASS SGP TEMPERED LAMINATD GLASS |
||
Color | clear, blue, grey, green ,bronze etc. | ||
Package | Plywood crate/non-fumigation wooden box | ||
Thickness |
3mm, 4mm,
5mm, 6mm, 8mm, 10mm, 12mm, |
6.38 8.76 10.38 12.38 12.76etc. |
13.52 17.52 21.52 25.52 |
Shapes | Flat Tempered / Curved Tempered Glass | ||
Size | As per customers' demand | ||
Max size | 5000mmx2440mm EASTGLASS INDUSTRIAL | ||
Edge work: | Pencil edge, Flat edge with edge arrised, Beveled edge, polished edge... | ||
Certification | CE, ISO9001:2015, AS/NZS2208:1996 | ||
Applications | 1). Architecture: Curtail wall, glass ribs, windows & doors, glass railing, balcony Balustrade, swimming pool fence, storefronts glass, etc. 2). Decoration: Shower enclosures & doors, interior glass screens, room partitions, glass walls and floors, etc. 3). Glass showcase in shopping mall and museum. 4). Thermal application-Cover glass of flat plate solar collectors (FPC), Solar Panels. |
||
HS CODE: | 7007190000 |
FAQ
What is your delivery time:
EASTGLASS EACELLENT glass: it is within 20 days for one 20' container.
What is your sample policy
EASTGLASS EACELLENTglass: The sample is free, you have to pay the freight charge. The sample will be finished one week.
What is Quality Control system?
EASTGLASS EACELLENTglass 5 steps:
A, After order confirmed, we have a meeting with the main peoples who work for workshop before production,investigate all the workmanship and some technical problems, ensure all of them have related ways to settle and control.
B, Inspect all the materials when arrived, ensure they will be catched up customers's requirements.
C, Inspect the semi-finished goods.
D, Inspect the finished products.
E, Final inspection when pack up all the goods.if there is not any problems for this step,our QC will issue the inspection report and release this products.